The work has been done during a five-months traineeship period in the office The Lab of the company Management Solution 4 Construction, both situated in Madrid. The core business of the company is engineering and architecture projects, particularly focused on structural design and project management. A renovation and expansion project has been choose, nowadays finished and working, for which the office followed the executive design and construction management. After an in-depth study of the project has been done a Life Cycle Assessment of the refurbished building. The work has been based on the international technical directives for the LCA and WLCA. Specific attention has been dedicated to the comparison of the design data and materials and quantities effectively used during the construction, to the energy demand during the first two years of operation, to the wastes and end-of-life management. After having analysed the data from the assessment, different solutions have been proposed which could have been applied during the constructive phase to reduce the environmental impact, without compromised the requests made by the client. Finally have been shown a comparison of the two solution based on the environmental harm indexes values estimated using the LCA. During both phases the circularity of the construction has been taken in account using the project site parameters, the wastes management and the amount of materials recyclable and reusable after the building's end of life.
Il lavoro è stato svolto nell'ambito di un tirocinio di sei mesi a Madrid presso la sede The Lab dell'azienda Management Solution 4 Construction, operante nel campo ingegneria e architettura. E' stato scelto un progetto di rinnovo e ampliamento, ad oggi realizzato e funzionante, per il quale lo studio aveva seguito la progettazione esecutiva e direzione lavori. A seguito di una approfondita valutazione del progetto è stata svolta un'analisi d'impatto ambientale relativa a tutta la vita dell'edificio ristrutturato, basandosi sulle norme tecniche internazionali per la LCA e WLCA. Particolare attenzione è stata dedicata al confronto tra i dati di progetto e i materiali e le quantità effettivamente utilizzati nella realizzazione, al consumo energetico dell'edificio durante i primi due anni di utilizzo e alla gestione dei rifiuti e della fase post-utilizzo. A seguito dei dati riscontrati sono state proposte soluzioni differenti che avrebbero potuto ridurre l'impatto in fase di costruzione senza interferire con le richieste effettuate dalla committenza. Si è infine presentato un confronto tra le due soluzioni basato sui principali indici di impatto ambientale stimabili attraverso la LCA. Durante entrambe le analisi è stata tenuta in considerazione la circolarità della costruzione in relazione al sito in cui è stata realizzata, alla gestione dei rifiuti e alla quantità di materiali riciclabili e riutilizzabili a fine vita.
Valutazione dell’impatto ambientale del ciclo di vita di un edificio ristrutturato: Caso di studio di un progetto a Valsaín, Spagna
GARINO, GIORGIO
2020/2021
Abstract
The work has been done during a five-months traineeship period in the office The Lab of the company Management Solution 4 Construction, both situated in Madrid. The core business of the company is engineering and architecture projects, particularly focused on structural design and project management. A renovation and expansion project has been choose, nowadays finished and working, for which the office followed the executive design and construction management. After an in-depth study of the project has been done a Life Cycle Assessment of the refurbished building. The work has been based on the international technical directives for the LCA and WLCA. Specific attention has been dedicated to the comparison of the design data and materials and quantities effectively used during the construction, to the energy demand during the first two years of operation, to the wastes and end-of-life management. After having analysed the data from the assessment, different solutions have been proposed which could have been applied during the constructive phase to reduce the environmental impact, without compromised the requests made by the client. Finally have been shown a comparison of the two solution based on the environmental harm indexes values estimated using the LCA. During both phases the circularity of the construction has been taken in account using the project site parameters, the wastes management and the amount of materials recyclable and reusable after the building's end of life.È consentito all'utente scaricare e condividere i documenti disponibili a testo pieno in UNITESI UNIPV nel rispetto della licenza Creative Commons del tipo CC BY NC ND.
Per maggiori informazioni e per verifiche sull'eventuale disponibilità del file scrivere a: unitesi@unipv.it.
https://hdl.handle.net/20.500.14239/14261