The work analyzes the emergency electrical distribution system of the Parona Waste-to-Energy plant, which is essential to ensure operational continuity in the event of main grid failures. The thesis describes improvement interventions based on the implementation of new electrical cabinets for power distribution management, the revision of switching logic, the optimization of the plant configuration and the integration with the advanced on-site automation systems (PLC/SCADA). Proper attention has been given to the correct sizing of components and the calibration of protection devices. The upgrades described and implemented are designed to enhance the plant’s reliability and resilience, ensuring operational continuity and compliance with environmental regulations.
Il lavoro analizza il sistema di distribuzione elettrica di soccorso del termovalorizzatore di Parona (PV), essenziale per garantire continuità operativa in caso di guasti della rete principale. La tesi descrive interventi di miglioramento basati su implementazioni di nuovi armadi elettrici per la gestione della distribuzione della rete, revisione delle logiche di commutazione, ottimizzazione della configurazione impiantistica e integrazione ai sistemi avanzati di automazione (PLC/SCADA) presenti in sito. Viene inoltre considerata l’importanza del corretto dimensionamento dei componenti e della taratura dei dispositivi di protezione. Le modifiche descritte ed attuate hanno il fine di incrementare l’affidabilità e la resilienza dell’impianto, assicurando la continuità del trattamento dei rifiuti e il rispetto delle normative ambientali.
Interventi di miglioramento del sistema elettrico del termovalorizzatore di Parona
FERRIELLO, MATTEO
2024/2025
Abstract
The work analyzes the emergency electrical distribution system of the Parona Waste-to-Energy plant, which is essential to ensure operational continuity in the event of main grid failures. The thesis describes improvement interventions based on the implementation of new electrical cabinets for power distribution management, the revision of switching logic, the optimization of the plant configuration and the integration with the advanced on-site automation systems (PLC/SCADA). Proper attention has been given to the correct sizing of components and the calibration of protection devices. The upgrades described and implemented are designed to enhance the plant’s reliability and resilience, ensuring operational continuity and compliance with environmental regulations.| File | Dimensione | Formato | |
|---|---|---|---|
|
TESI_Matteo Ferriello.pdf
embargo fino al 02/11/2026
Descrizione: L'elaborato descrive gli interventi che sono stati effettuati sulla rete di distribuzione interna del Termovalorizzatore di Parona con l’obiettivo di aumentare affidabilità, sicurezza garantendo anche la continuità operativa dell’impianto.
Dimensione
2.16 MB
Formato
Adobe PDF
|
2.16 MB | Adobe PDF | Richiedi una copia |
È consentito all'utente scaricare e condividere i documenti disponibili a testo pieno in UNITESI UNIPV nel rispetto della licenza Creative Commons del tipo CC BY NC ND.
Per maggiori informazioni e per verifiche sull'eventuale disponibilità del file scrivere a: unitesi@unipv.it.
https://hdl.handle.net/20.500.14239/35009